首页> 中文期刊> 《气象与环境研究:英文版》 >Uncertainty on Design Critical Rainfall for Flash Flood Early Warning : A Case Study of South Branch Watershed of Censhui

Uncertainty on Design Critical Rainfall for Flash Flood Early Warning : A Case Study of South Branch Watershed of Censhui

         

摘要

Critical rainfall estimation for early warning of rainstorm-induced flash flood is an inverse rainstorm-0x09runoff process based on warning discharge threshold for a warning station of interest in a watershed;the key aspects of critical rainfall include rainfall amount and rainfall duration. Antecedent moisture content and storm pattern affects highly the estimation of critical rainfall. Using hydrological modeling technique with detailed sub-basin delineation and manual for design rainstorm-runoff computation, this study first introduced basic concept and analysis methods on critical rainfall for flash flood early warning, and then investigated the responses of flash flood warning critical rainfall to antecedent moisture content and storm pattern. Taking South Branch Watershed of Censhui in Hunan Province as an example, critical rainfall in scenarios of typical antecedent moisture content and storm patterns was estimated at 3 warning stations of interest in this watershed. This research illustrates that both antecedent and storm pattern play important role in the estimation of critical rainfall and enough attention should also be paid to these factors when a decision to be made on whether a warning to be issued or not.

著录项

  • 来源
    《气象与环境研究:英文版》 |2019年第1期|P.31-38|共9页
  • 作者单位

    [1]China Institute of Water Resources and Hydropower Research;

    Beijing 100038;

    China;

    [2]Center of Flood and Drought Disaster Reduction of Ministry of Water Resources;

    Beijing 100038;

    China;

    [1]China Institute of Water Resources and Hydropower Research;

    Beijing 100038;

    China;

    [2]Center of Flood and Drought Disaster Reduction of Ministry of Water Resources;

    Beijing 100038;

    China;

    [1]China Institute of Water Resources and Hydropower Research;

    Beijing 100038;

    China;

    [2]Center of Flood and Drought Disaster Reduction of Ministry of Water Resources;

    Beijing 100038;

    China;

    [1]China Institute of Water Resources and Hydropower Research;

    Beijing 100038;

    China;

    [2]Center of Flood and Drought Disaster Reduction of Ministry of Water Resources;

    Beijing 100038;

    China;

    [1]China Institute of Water Resources and Hydropower Research;

    Beijing 100038;

    China;

    [2]Center of Flood and Drought Disaster Reduction of Ministry of Water Resources;

    Beijing 100038;

    China;

  • 原文格式 PDF
  • 正文语种 CHI
  • 中图分类 天文学、地球科学;
  • 关键词

    Uncertainty; Design; critical; rainfall; Antecedent; moisture; content; Storm; pattern;

    机译:不确定性;设计;关键;降雨;前期;水分;含量;暴风雨;模式;
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号