Considering the time value of funds, based on the depreciation method of compound interest and the relationship between mine production scale and equipment capacity and actual conditions of mines, the paper solves the optimized configuration problem about the type of main mechanical equipment and the quantity by applying integrated planning and Matlab software at the preliminary scheduling phase. This optimized configuration scheme brings better benefits for mining enterprises and provides a new idea about optimized configuration of equipment in capital construction phase of mine.%考虑到资金使用的时间价值,依据复利法的折旧方式以及矿山生产规模与设备生产能力的关系,结合矿山的实际情况,运用整数规划及Matlab软件解决露天矿山在生产规划阶段主体机械的设备型号、数量选择的优化配置问题,进而使矿山取得较好的经营效益,为基建期的矿山企业优化机械设备提供了一种新思路.
展开▼