首页> 中文期刊> 《金属矿山》 >地下金属矿山新型无矿柱连续开采方法试验研究

地下金属矿山新型无矿柱连续开采方法试验研究

         

摘要

通过对安庆铜矿1#矿体整体开采方案的试验研究,提出一种地下金属矿山新型无矿柱连续开采方法:利用高强度尾砂胶结充填体和出矿底部结构的三角矿柱形成隔离层替代阶段间水平矿柱,并通过合理的采场布置、回采顺序和充填方法,确保各阶段采场安全高效开采.该方法为全矿体连续开采提供一种新思路,对丰富连续开采理论有着一定意义.%Through the experimental research on the entire mining scheme for 1# ore-body of Anqing Copper Mine,a new non-pillar continuous mining method for underground metal mines is proposed.In this method,a isolation layer formed by the high strength cemented tailing filling body and the triangle pillars at bottom structure replaces the horizontal floor pillars.Also,every mining step should be ensured to be safe and high efficient through reasonable stope layout,stoping sequence and backfill method.This method provides a new thought for the continuous mining of total ore-body.It has a certain significance for enriching the theory of the continuous mining.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号