首页> 中文期刊>金属矿山 >灵乡铁矿残留点柱回收与采空区稳定性分析

灵乡铁矿残留点柱回收与采空区稳定性分析

     

摘要

In view of the influence of the recovery of residual point pillars at mined-out areas on the overlying strata and surface facilities in Lingxiang Iron Mine, the stoping process of the residual point pillars were simulated with FEM, indicating the stress change law and stress distribution of roof and verifying the feasibility of the recovery. According to the stress variety in the stoping process, it is recommended that the second stoping scheme be a lot safer and AE monitoring points be laid out at No. 2 and No. 5 pillars.%针对灵乡铁矿拟回采采空区内部分点柱对空区上覆岩层和地表设施的影响,采用有限元法对其回采过程进行了模拟,揭示了回采过程中点柱的应力变化规律及顶板的应力分布变化,证明了回采工作的可行性.结合回采过程中应力变化,建议采用方案二进行回采是比较安全的,同时建议在2号、5号点柱上布置声发射监测点.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号