某长距离输水工程位于干旱、沙漠地区,施工供水条件相对较差,水源远离施工现场,施工供水方案成为工程建设的重大问题。通过方案比较和技术经济分析,最终确定了既满足工程技术要求、又便于实施、经济合理的施工供水方案。%A long‐distance water conveyance project is located in arid and desert area ,water supply conditions for the construc‐tion of long‐distance water conveyance project are relatively poor and the water away from the construction site ,therefore the water supply scheme of construction has become a major problem in the engineering construction .Through technical and eco‐nomic analysis ,the construction of water supply scheme is determined ,which not only satisfies the requirements of engineering and technology ,but is easy ,economical ,and reasonable to implement .
展开▼