首页> 外文期刊>中国海洋大学学报(英文版) >Filling of the Three Gorges Reservoir to the 135-m Level:Instant Effects on the Yangtze Discharge and Suspended Sediment Concentration Entering the Estuary
【24h】

Filling of the Three Gorges Reservoir to the 135-m Level:Instant Effects on the Yangtze Discharge and Suspended Sediment Concentration Entering the Estuary

机译:三峡水库填满至135米的水位:对长江流量和悬浮泥沙浓度进入河口的即时影响

获取原文
获取原文并翻译 | 示例
       

摘要

Via the valuable opportunity of the Three Gorges Reservoir (TGR) 135-m filling in June 2003, the Yangtze discharge and suspended sediment concentration (SSC) entering the estuary during the period from 15 May to 15 July 2003 were analyzed to examine the instant effects of the filling on them. The Yangtze discharge and SSC entering the estuary in the periods before, during and after the filling clearly indicated three phases: 1) the pre-storage phase characterized by natural conditions, in which the SSC increased with increasing water discharge; 2) the storage phase, during which the SSC decreased dramatically with decreasing water discharge; and 3) the post-storage phase, during which both the SSC and water discharge remained at relatively low levels first until the end of June, then the SSC increased gradually with increasing water discharge. It seems that the times for the instant effects of the decreasing discharge downstream from the upper Yangtze on the Yangtze discharge and SSC entering the estuary due to the TGR 135-m filling to take place were about 5d and 1d respectively, while both were about 18d for those of the increasing discharge. This probably reflects the buffering and resultantly hysteresis of the 1800-km stretch from the upper Yangtze to the estuary. The results are helpful for scientific and hydrological investigation of the Yangtze mainstream downstream from the TGR Dam and of the estuarine and adjacent coastal waters.
机译:通过三峡库区的宝贵机会(TGR)于2003年6月15日填充135-M填充,分析了2003年5月15日至7月15日期间进入河口的长江排放和悬浮沉积物浓度(SSC)以审查即时效应填补它们。在填充之前,期间和之后的期间内进入河口的长江排放和SSC清楚地表明三个阶段:1)预储存阶段以天然条件为特征,其中SSC随着排水而增加; 2)存储阶段,在此期间,SSC随着排水的降低而显着降低; 3)后贮存阶段,在6月底之前,SSC和排水均保持在相对较低的水平,然后SSC随着排水的增加而逐渐增加。看来,由于TGR 135-M填充,在长江放电和SSC进入河口的下游下游的瞬间效果的时间效果分别为约5D和1D,而两者约为18D对于那些越来越大的放电。这可能反映了从横向到河口的1800公里延伸的缓冲和产生的滞后。结果有助于对TGR水坝和河口和邻近沿海水域的长江主流的科学和水文调查。

著录项

  • 来源
    《中国海洋大学学报(英文版)》 |2009年第3期|291-295|共5页
  • 作者单位

    Key Lab of Submarine Geosciences and Prospecting Techniques, Ministry of Education, Ocean University of China, Qingdao 266100, P. R. China;

    Key Lab of Submarine Geosciences and Prospecting Techniques, Ministry of Education, Ocean University of China, Qingdao 266100, P. R. China;

    Key Lab of Submarine Geosciences and Prospecting Techniques, Ministry of Education, Ocean University of China, Qingdao 266100, P. R. China;

    Key Lab of Submarine Geosciences and Prospecting Techniques, Ministry of Education, Ocean University of China, Qingdao 266100, P. R. China;

  • 收录信息 中国科技论文与引文数据库(CSTPCD);
  • 原文格式 PDF
  • 正文语种 chi
  • 中图分类 海洋学;
  • 关键词

  • 入库时间 2022-08-19 03:49:12
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号