首页> 中文期刊> 《华北科技学院学报》 >浅析城市轨道交通项目试运营前热烟测试的组织协调工作

浅析城市轨道交通项目试运营前热烟测试的组织协调工作

         

摘要

With the rapid development of urban rail transit in China, a certain number of subway lines are opened every year. According to Safety Evaluation Standard on Trial Operation of Urban Rail Transit, it is necessary to test and evaluate the urban rail transit disaster prevention system by the on-site disaster prevention and safety smoke test, short for hot smoke test. Therefore, it is very important to successfully and efficiently organize a hot smoke test so that the new subway line can be successfully opened. Based on nearly 40 on-site smoke tests, by analyzing the work arrangement of the hot smoke test, this article makes a summary of the matters needing attention throughout the test work, and puts forward some countermeasures for the coordination of experimental organization, so that the hot smoke test can be carried out smoothly.%随着我国城市轨道交通的快速发展,每年都会开通一定数量的地铁线路.根据《城市轨道交通试运营前安全评价规范》,需要通过现场防灾安全热烟测试,简称热烟测试,对城市轨道交通防灾系统进行检测和评价.因此,能否成功、高效地组织一次热烟测试,使得新建地铁线路顺利开通,就显得尤为重要.基于参加过的近四十次现场热烟测试,本文通过分析热烟测试工作安排,对整个测试工作需要注意的事项进行一个总结,提出有关实验组织协调方面的对策,使得热烟测试工作能够顺利进行.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号