首页> 中文期刊> 《铁道工程科学:英文版》 >Dynamics Performance of Subgrade-Tunnel Transition on Chongqing-Suining Ballastless Track

Dynamics Performance of Subgrade-Tunnel Transition on Chongqing-Suining Ballastless Track

         

摘要

Experiments were conducted on China railway high speed electrical multiple units (EMUs) CRH2 and freight car C80 on Chongqing-Suining high-speed ballastless track. Based on the experimental results,the dynamics performance of cement concrete transition and cement stabilized aggregate transition was analyzed. The results show that the dynamic stress,vibration displacement,vibration velocity,vibration acceleration and other vibration parameters vary steadily on the profile section of transitions,and that at the adjoining position between subgrade and tunnel portal,cement concrete transition has gradual hardness change,whereas cement stabilized aggregate transition exhibits good elasticity,small shock,and small dynamic effect of the cars.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号