首页> 中文期刊> 《昆明冶金高等专科学校学报》 >利用C RI改善人工湿地系统堵塞情况的研究

利用C RI改善人工湿地系统堵塞情况的研究

             

摘要

人工湿地是人为设计建造用于处理污水的工程设施,存在着系统水力负荷偏小、占地面积大、系统供氧不足、氮磷的去除效率偏低、易堵塞等弱点。人工快速渗滤污水处理系统(CRI)是污水土地处理法中的一种类型,系统基本的处理机理是有控制地将污水投放于特定渗滤介质的表面,使其在向下渗透的过程中达到净化污水的过程。实验研究了将CRI作为人工湿地系统的前置处理单元改善人工湿地易堵塞的问题,并对改善原因作了分析,得出利用人工快速滤与人工湿地处理系统组合后,可以有效地改善堵塞状况,同时较一般未设预处理设施的人工湿地可以较长时间运行的结论。%Constructed wetlands is a man-made works for wastewater treatment facilities.The disadvanta-ges of the system include small hydraulic load,large area,insufficient oxygen supply system,low remov-al efficiency of nitrogen,phosphorus and easy to plug etc.Constructed rapid infiltration wastewater trea-ting system (CRI)is a type of wastewater land treatment.The basic processing mechanism is sewage into specific surface of percolation medium to purify the wastewater.Experiment studied the CRI as pre-pro-cessing unit of artificial wetland system to improve the effect of artificial wetland easily blocked,and the improving reason was analyzed.It is concluded that use of CRI +artificial wetland treatment system, can effectively improve the congestion.Compare to constructed wetland without preprocessing facilities, the composite system can run for a long time.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号