A Rescheduling Method for Operation Time Delay Disturbance in Steelmaking and Continuous Casting Production Process

机译:炼钢连铸生产过程中操作时延扰动的重新调度方法

获取原文
获取原文并翻译 | 示例
       

摘要

In the steelmaking and continuous casting (SMCC) production process, operation time delay may lead to casting break or processing conflict so that the initial scheduling plan becomes unrealizable. Existing research meth- ods are difficult to guarantee the accuracy of the model and successful application to actual applications. The resched- uling problem in response to operation time delay is firstly analyzed. This is then followed by the establishment of a novel multi-obiective nonlinear programming model (MONPM). In specifications, a three-stage rescheduling method is proposed including the batches splitting (BS), forward scheduling method (FSM) and backward scheduling meth- od (BSM). As a result, the real-time application shows that the proposed rescheduling method efficiently ensures the continuous casting and dramatically shortens the redundant waiting time for molten steel in very short rescheduling time.
机译:在炼钢和连铸(SMCC)生产过程中,操作时间延迟可能会导致铸件断裂或加工冲突,从而使初始调度计划变得无法实现。现有的研究方法很难保证模型的准确性和成功应用于实际应用中。首先分析了响应操作时间延迟的重新调度问题。然后,建立新的多目标非线性规划模型(MONPM)。在规范中,提出了一种三阶段的重新调度方法,包括批处理拆分(BS),前向调度方法(FSM)和后向调度方法(BSM)。结果,实时应用表明,所提出的重新调度方法有效地保证了连铸,并且在非常短的重新调度时间内大大缩短了钢水的冗余等待时间。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号