首页> 外文期刊>哈尔滨工业大学学报:英文版 >Comparing the bullwhip effect under different inventory policies in engineering project supply chains
【24h】

Comparing the bullwhip effect under different inventory policies in engineering project supply chains

机译:比较工程项目供应链中不同库存政策下的牛鞭效应

获取原文
获取原文并翻译 | 示例
           

摘要

Measuring bullwhip effect is useful for making better controls on production planning and enhancing the supply chain operating efficiency.First,this article establishes the comparative analysis model of bullwhip effect between(s,S)and Periodic Review(PR)inventory policy based on the quantitative bullwhip effect model under different inventories.Then,the impacts of lead time,inventory review time,autocorrelation coefficient,and the number of samples on the gap of bullwhip effect under(s,S)and PR IP are analyzed.The results show that bullwhip effect in PR is more intense than(s,S)inventory policy.Contractors should pay more attention to control bullwhip effect when adopting PR inventory policy to enhance the total operating efficiency of the engineering project supply chains.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号