首页> 中文期刊> 《哈尔滨工业大学学报:英文版》 >Application of new techniques to renovation of 200 MW steam turbine

Application of new techniques to renovation of 200 MW steam turbine

         

摘要

Presents the new techniques leading to the improvements in aerodynamics of 200MW steam turbine high pressure cylinder and mid pressure cylinder, discusses the rear loaded profile and blade bowing, and concludes from numerical simulation and experimental results that the application of rear loaded profile and blade bowing has improved the performance of 200 MW unit.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号