首页> 中文期刊> 《东华大学学报:英文版》 >Process of Waste Sludge Facultative Metabolism

Process of Waste Sludge Facultative Metabolism

         

摘要

Laboratory- scale experiments were conducted to determine new technology of waste sludge facultative metabolism . 10-L laboratory-scale facultative reactors were operated during 24-hour sludge residence time (SRT) and in room temperature . Results show that the organic matter in waste sludge after hydrolysis acidification will be reduced by 75.39%, the removal rate of CODer above 85% . Advantage of the process is hydrolysis-acidification in ambient air temperature as there is no need for facilities to be sealed or heated. In addition, the sludge will be recycled into the wastewater treatment system and finally towards zero-discharge.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号