首页> 外文期刊>煤炭学报:英文版 >Reliability modeling of hydraulic system of drum shearer machine
【24h】

Reliability modeling of hydraulic system of drum shearer machine

机译:滚筒采煤机液压系统的可靠性建模

获取原文
获取原文并翻译 | 示例
       

摘要

The hydraulic system plays an important role in supplying power and its transition to other working parts of a coal shearer machine.In this paper,the reliability of the hydraulic system of a drum shearer was analyzed.A case study was done in the Tabas Coal Mine in Iran for failure data collection.The results of the statistical analysis show that the time between failures (TBF)data of this system followed the 3-parameters Weibull distribution.There is about a 54% chance that the hydraulic system of the drum shearer will not fail for the first 50 h of operation.The developed model shows that the reliability of the hydraulic system reduces to a zero value after approximately 1 650 hours of operation.The failure rate of this system decreases when time increases.Therefore,corrective maintenance(run-to-failure)was selected as the best maintenance strategy for it.
机译:液压系统在给采煤机的动力及其过渡过程中起着重要作用。本文分析了鼓式采煤机液压系统的可靠性。以塔巴斯煤矿为例统计分析结果表明,该系统的故障间隔时间(TBF)数据遵循3参数的Weibull分布。滚筒式采煤机的液压系统将有54%的机会发生故障。在运行的最初50小时内不会出现故障。开发的模型表明,液压系统的可靠性在大约运行1600小时后降低到零值。随着时间的增加,该系统的故障率降低。因此,进行纠正性维护(选择“运行至故障”作为最佳维护策略。

著录项

  • 来源
    《煤炭学报:英文版》 |2011年第004期|450-456|共7页
  • 作者单位

    Faculty of Mining,Petroleum & Geophysics,Shahrood University of Technology,Shahrood 3619995161,Iran;

    Faculty of Mining,Petroleum & Geophysics,Shahrood University of Technology,Shahrood 3619995161,Iran;

    Faculty of Mining,Petroleum & Geophysics,Shahrood University of Technology,Shahrood 3619995161,Iran;

    Division of Operation and Maintenance Engineering,Lulea University of Technology,Lulea 97187,Sweden;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 chi
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 14:20:26
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号