3-D numerical modelling of Domino failure of hard rock pillars in Fetr6 Chromite Mine, Iran, and comparison with empirical methods

机译:伊朗Fetr6铬铁矿硬岩柱Domino破坏的3-D数值模拟以及与经验方法的比较

获取原文
获取原文并翻译 | 示例
       

摘要

Fetr6 is an underground mine using the stope-and-pillar mining method. As there was some evidence regarding pillar failure in this mine, improving works such as roof support and replacing existing pillars with concrete pillars (CP) were carried out. During the construction of the second CP, in the space between the remaining pillars, one of the pillars failed leading to the progressive failure of other pillars until 4 000 m 2 of mine had collapsed within a few minutes. In this work, this phenomenon is described by applying both numerical and empirical methods and the respective results are compared. The results of numerical modelling are found to be closer to the actual condition than those of the empirical method. Also, a width-to-height (W/H) ratio less than 1, an inadequate support system and the absence of a detailed program for pillar recovery are shown to be the most important causes of the Domino failure in this mine.

著录项

  • 来源
    《中南大学学报(英文版)》 |2013年第2期|541-549|共9页
  • 作者单位

    Department of Mining Engineering, Science and Research Branch, Islamic Azad University,Tehran 14155-4933, Iran;

    Department of Mining and Metallurgical Engineering, Amirkabir University of Technology,Tehran 15875-4413, Iran;

    Department of Mining and Metallurgical Engineering, Amirkabir University of Technology,Tehran 15875-4413, Iran;

    Department of Mining Engineering, Tarbiat Modares University, Tehran 14115-143, Iran;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 chi
  • 中图分类
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号