Joint scheduling of surface water,groundwater is completed in Jilin city.Water allocation model using water regulation,the model based on the current urban sections of the Second Songhua River water,groundwa-ter exploitation and future periods water requirements ,based on the forecast runoff through the water balance calculation,given the various water supply,the amount of groundwater pumping,the municipal boundaries of sections over the water flow,water district for water and loss of water and other related scheduling recommen-dations in Jilin,using the model simulation,water resources joint scheduling in Jilin city is completed.%吉林市城区水资源联合调度通过地表水、地下水联合调度完成。利用水资源配置模型进行水量调度,模型根据第二松花江城区段当前水量、地下水可开采量与未来时段用水要求,在预测来水基础上,通过水量平衡计算,给出吉林市各水厂供水量、地下水抽水量、市界断面过水流量、供水区可供水量与亏水量等相关调度建议,利用模型模拟,完成吉林市城区水资源联合调度。
展开▼