首页> 外文期刊>矿业科学技术学报:英文版 >Stability control of gob-side entry retained under the gob with close distance coal seams
【24h】

Stability control of gob-side entry retained under the gob with close distance coal seams

机译:具有近距离煤层的GOB侧入口稳定性控制

获取原文
获取原文并翻译 | 示例
       

摘要

In multi-seam mining,the interlayer rock strata between the upper coal seam(UCS)and the lower coal seam(LCS)appear damage and strength weakening after mining the UCS.Ground stability control of the gob-side entry retaining(GER)under the gob with close distance coal seams(CDCS)is faced with difficulties due to little attention to GER under this condition.This paper focuses on surrounding rock stability control and technical parameters design for GER under the gob with CDCS.The floor rock strata damage characteristics after mining the UCS is first evaluated and the damage factor of the interlayer rock strata below the UCS is also determined.Then,a structural mechanics model of GER surrounding rock is set up to obtain the main design parameters of the side-roadway backfill body(SBB)including the maximum and minimum SBB width calculation formula.The optimal SBB width and the water-to-cement ratio of high water quick-setting material(HWQM)to construct the SBB are determined as 1.2 m and 1.5:1.0,respectively.Finally,engineering trial tests of GER are successfully carried out at#5210 track transportation roadway of Xingwu Colliery.Research results can guide GER design under similar mining and geological conditions.
机译:在多煤层挖掘中,在挖掘UCS的UCS.Ground稳定性控制(GER)下,上煤层(UCS)和下煤层(LCS)和下煤层(LCS)之间的层间岩层出现损坏和强度弱化具有近距离煤层(CDC)的甘露果虎虎面临困难,因为在这种情况下很少关注GER。本文重点介绍GER与CDC的GEB下GER的围岩稳定控制和技术参数设计。地板岩层损伤特征在开采UCS之后,首先评估UCS,并且还确定了UCS下方的层间岩层的损伤因子。然后,设置了GER周围岩石的结构力学模型,以获得侧路回填机构的主要设计参数( SBB)包括最大和最小SBB宽度计算公式。最佳的SBB宽度和高水快速设定材料(HWQM)的水 - 水泥比构建SBB的宽度确定为1.2米和1.5 :1.0分别。最后,GER的工程试验试验在兴武煤炭的#5210轨道运输巷道成功开展。搜索结果可以在类似的采矿和地质条件下指导GER设计。

著录项

  • 来源
    《矿业科学技术学报:英文版》 |2021年第002期|P.321-332|共12页
  • 作者单位

    Work Safety Key Lab on Prevention and Control of Gas and Roof Disasters for Southern Coal Mines Hunan Provincial Key Laboratory of Safe Mining Techniques of Coal Mines Hunan University of Science and Technology Xiangtan 411201 China;

    Work Safety Key Lab on Prevention and Control of Gas and Roof Disasters for Southern Coal Mines Hunan Provincial Key Laboratory of Safe Mining Techniques of Coal Mines Hunan University of Science and Technology Xiangtan 411201 China;

    State Key Laboratory of Coal Resources and Safe Mining China University of Mining and Technology Xuzhou 221116 China;

    Jiangsu Engineering Laboratory of Mine Earthquake Monitoring and Prevention School of Mines China University of Mining and Technology Xuzhou 221116 China;

    Work Safety Key Lab on Prevention and Control of Gas and Roof Disasters for Southern Coal Mines Hunan Provincial Key Laboratory of Safe Mining Techniques of Coal Mines Hunan University of Science and Technology Xiangtan 411201 China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 chi
  • 中图分类 矿山开采;
  • 关键词

    Gob-side entry retaining; Close distance coal seams; Damage factor; Interlayer rock strata; Side-roadway backfill body;

    机译:GOB侧进入保留;关闭距离煤层;损伤因子;层间岩层;侧巷回填体;
  • 入库时间 2022-08-19 04:57:01
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号