Backfilling technology and strata behaviors in fully mechanized coal mining working face

机译:综采工作面回填技术及地层行为

获取原文
获取原文并翻译 | 示例
           

摘要

Based on the principle of fully mechanized backfilling and coal mining technology and combined with theXingtai Coal Mine conditions,we mainly optimized the coal mining equipment and adjusted the coal mining method in the Xingtai Coal Mine 7606 working face for implementation this technology,Firstly,we define the practical backfilling process as the "(from backfilling scraper conveyor's) head to tail backfilling,step by step swinging up of the tamping arm.gradual compacting,moving formed backfilling scraper conveyor when the second tamping arm cannot pass and connecting the immediate roof by back material push front material movement".Meanwhile,the stress changes of backfill body in coal mined out area was monitored by stress sensors,and the roof caving law was analyzed by monitoring the dynamic subsidence of -210 west roadway of this face.The site tests results show that using this new backfilling and coal mining integrated technology,the production capacity in the 7606 working face can reach to 283,000 ton a year,and 282,000 ton of solid materials (waste and fly ash) is backfilled,which meets the needs of high production and efficiency.The goaf was compactly backfilled with solid material and the strata behavior was quite desirable,with an actual maximum vertical stress of the backfill body of 5.5 MPa.Backfill body control the movement of overburden within a certain range,and there is no collapses of major areas in the overlying strata upon backfilled gob.The maximum subsidence and speed were 231 mm and 15.75 mm/d respectively,which proved the practical significance of this integrated technology.
机译:基于综采回采和采煤技术的原理,结合邢台煤矿的条件,主要对邢台煤矿7606工作面的采煤设备进行了优化,并调整了采煤方法,以实现该技术。实际的回填过程是“(从回填刮板输送机的)头到尾部回填,逐步移动捣固臂。逐步压实,在第二个捣固臂无法通过时移动形成的回填刮板输送机,并通过后向连接直接顶板同时,通过应力传感器监测采空区回填体的应力变化,并通过监测该工作面-210西巷的动态沉陷来分析顶板冒顶规律。结果表明,采用这种新的回填和采煤集成技术,可在7606工作面的产能年采煤量达到28.3万吨,回填了28.2万吨固体物料(废粉煤灰和粉煤灰),满足了高产量和高效率的要求。采空区被紧凑地回填了固体物料,地层表现非常理想,回填体的实际最大垂直应力为5.5 MPa。回填体将覆土的运动控制在一定范围内,回填采空区时上覆地层的主要区域没有塌陷,最大沉降和速度为231 mm和分别为15.75 mm / d,证明了该集成技术的实际意义。

著录项

  • 来源
    《矿业科学技术(英文版)》 |2012年第2期|151-157|共7页
  • 作者单位

    School of Mines,China University of Mining Technology,Xuzhou 221116,China;

    State Key Laboratory of Coal Resources Mine safety,Xuzhou 221008,China;

    School of Mines,China University of Mining Technology,Xuzhou 221116,China;

    State Key Laboratory of Coal Resources Mine safety,Xuzhou 221008,China;

    School of Mines,China University of Mining Technology,Xuzhou 221116,China;

    State Key Laboratory of Coal Resources Mine safety,Xuzhou 221008,China;

    School of Mines,China University of Mining Technology,Xuzhou 221116,China;

    State Key Laboratory of Coal Resources Mine safety,Xuzhou 221008,China;

  • 收录信息 中国科技论文与引文数据库(CSTPCD);
  • 原文格式 PDF
  • 正文语种 chi
  • 中图分类
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号