摘要

In solid backfill mining without gangue removal, the gangue is separated directly underground and backfilled into goaf. This necessitates the underground construction of an extra-large section chamber for separation equipments. For the construction of an extra-large section chamber in the Tangshan mine, we proposed an active support through a combination of bolting, anchor cables, lining, and a reinforced chamber floor by inverted arch pouring. ABAQUS software was used to analyze the surrounding rock deformation and the plastic zone development of the chamber under different excavation schemes.The best excavation scheme was determined, and the effectiveness of the combined supports was verified. In practice, the engineering installation showed good overall control of the movement of the surrounding rock, with roof-to-floor and side-to-side convergences of 154.6 and 77.5 mm, respectively,which meets the requirements for underground coal gangue separation.

著录项

  • 来源
    《矿业科学技术(英文版)》 |2014年第6期|763-768|共6页
  • 作者单位

    1. State Key Laboratory of Geomechanics & Deep Underground Engineering;

    China University of Mining & Technology 2. School of Mines;

    China University of Mining & Technology 3. Key Laboratory of Deep Coal Resource Mining;

    Ministry of Education of China;

    Ch;

  • 原文格式 PDF
  • 正文语种 chi
  • 中图分类 TD823.7;
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号