首页> 中文期刊> 《矿业科学技术(英文版)》 >Investigation of the short-term stress distribution in stopes and drifts backfilled with cemented paste backfill

Investigation of the short-term stress distribution in stopes and drifts backfilled with cemented paste backfill

         

摘要

Cemented paste backfill(CPB) is largely used in underground mines worldwide.A key issue associated with application of CPB is to estimate the stresses in backfilled stopes and on barricades.Recent numerical and experimental results show that arching effect is absent shortly after the placement of CPB in stopes.However,stress decreases in barricade drift with increasing distance between the measurement points and drawpoint have also been observed,demonstrating arching effect shortly after the pouring of CPB.To explain these paradoxes,CPB is considered as Bingham fluid having a yield shear stress.Three dimensional analytical solutions are proposed to evaluate the short-term total stresses in backfilled stopes and on barricades,accounting for the CPB’s yield shear stress-induced arching effect.Stress diminution due to such arching effect in the backfilled stopes and on barricades is indeed obtained.But the reduction becomes insignificant using typical yield shear stress and stope geometry.More analyses indicate that the typical yield shear stress values do not fully correspond to field conditions where the yield shear stress would increase exponentially due to apparent consolidation(loss of water by drainage,a phenomenon similar to the desiccation of overly saturated fine-grained materials).

著录项

  • 来源
    《矿业科学技术(英文版)》 |2015年第5期|721-728|共8页
  • 作者

    Pengyu Yang; Li Li;

  • 作者单位

    Department of Civil;

    Geological and Mining Engineering;

    Ecole Polytechnique de Montreal;

  • 原文格式 PDF
  • 正文语种 chi
  • 中图分类 TD823.7;
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号