首页> 中文期刊> 《矿业科学技术(英文版)》 >Void fill techniques for stabilizing roof conditions during longwall recovery

Void fill techniques for stabilizing roof conditions during longwall recovery

         

摘要

It has been proven that longwall faces can be moved safely and efficiently. However,abutment pressures and poor ground control conditions can halt operations and be hazardous to coal miners. Recently at a mine in Southwestern Pennsylvania,roof material collapsed above shields that created two large voids and caused major challenges for shield recovery. A unique,engineering solution was developed that utilized a modified concrete material to fill the voids,creating stability in the affected area. The many phases of this project included the construction phase,void pumping,cutting out,and bolting of the concrete material. This project eliminated the hazards associated with bolting the recovery face and removing shields in adverse conditions,making it possible for the mine operator to safely complete the longwall move.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号