NPV risk simulation of an open pit gold mine project under the O’Hara cost model by using GAs

         

摘要

This paper analyzes an open pit gold mine project based on the O’Hara cost model. Hypothetical data is proposed based on different authors that have studied open pit gold projects, and variations are proposed according to the probability distributions associated to key variables affecting the NPV, like production level, ore grade, price of ore, and others, so as to see what if, in a gold open pit mine project of 3000 metric tons per day of ore. Two case scenarios were analyzed to simulate the NPV, one where there is low certainty data available, and the other where the information available is of high certainty. Results based on genetic algorithm metaheuristic simulations, which combine basically Montecarlo simulations provided by the Palisade Risk software, the O’Hara cost model, net smelter return and financial analysis tools offered by Excel are reported, in order to determine to which variables of the project is more sensitive the NPV.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号