首页> 外文期刊>矿业科学技术学报:英文版 >Simulation of recovery of upper remnant coal pillar while mining the ultra-close lower panel using longwall top coal caving
【24h】

Simulation of recovery of upper remnant coal pillar while mining the ultra-close lower panel using longwall top coal caving

机译:长壁顶放开采超封闭下面板开采上残留煤柱的模拟

获取原文
获取原文并翻译 | 示例
       

摘要

With the depletion of easily minable coal seams,less favorable reserves under adverse conditions have to be mined out to meet the market demand.Due to some historical reasons,large amount of remnant coal was left unrecovered.One such case history occurred with the remnant rectangular stripe coal pillars using partial extraction method at Guandi Mine,Shanxi Province,China.The challenge that the coal mine was facing was that there is an ultra-close coal seam right under it with an only 0.8–1.5 m sandstone dirt band in between.The simulation study was carried out to investigate the simultaneous recovery of upper remnant coal pillars while mining the ultra-close lower panel using longwall top coal caving(LTCC).The remnant coal pillar was induced to cave in as top coal in LTCC system.Physical modelling shows that the coal pillars are the abutments of the stress arch structure formed within the overburden strata.The stability of overhanging roof strata highly depends on the stability of the remnant coal pillars.And the gob development(roof strata cave-in)is intermittent with the cave-in of these coal pillars and the sandstone dirt band.FLAC3D numerical modelling shows that the multi-seam interaction has a significant influence on mining-induced stress environment for mining of lower panels.The pattern of the stress evolution on the coal pillars with the advance of the lower working face was found.It is demonstrated that the stress relief of a remnant coal pillar enhances the caveability of the pillars and sandstone dirt band below.
机译:With the depletion of easily minable coal seams,less favorable reserves under adverse conditions have to be mined out to meet the market demand.Due to some historical reasons,large amount of remnant coal was left unrecovered.One such case history occurred with the remnant rectangular stripe coal pillars using partial extraction method at Guandi Mine,Shanxi Province,China.The challenge that the coal mine was facing was that there is an ultra-close coal seam right under it with an only 0.8–1.5 m sandstone dirt band in between.The simulation study was carried out to investigate the simultaneous recovery of upper remnant coal pillars while mining the ultra-close lower panel using longwall top coal caving(LTCC).The remnant coal pillar was induced to cave in as top coal in LTCC system.Physical modelling shows that the coal pillars are the abutments of the stress arch structure formed within the overburden strata.The stability of overhanging roof strata highly depends on the stability of the remnant coal pillars.And the gob development(roof strata cave-in)is intermittent with the cave-in of these coal pillars and the sandstone dirt band.FLAC3D numerical modelling shows that the multi-seam interaction has a significant influence on mining-induced stress environment for mining of lower panels.The pattern of the stress evolution on the coal pillars with the advance of the lower working face was found.It is demonstrated that the stress relief of a remnant coal pillar enhances the caveability of the pillars and sandstone dirt band below.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号