首页> 外文期刊>矿业科学技术学报:英文版 >Land deformation monitoring in mining area with PPP-AR
【24h】

Land deformation monitoring in mining area with PPP-AR

机译:利用PPP-AR监测矿区土地变形

获取原文
获取原文并翻译 | 示例
       

摘要

The mining area deformation monitoring theory and method using precise point positioning(PPP) ambiguity resolution(AR) were studied, and an ambiguity fixing model with satellite and receiver combination phase delay(CPD) was proposed for zero-differenced PPP ambiguity fixing and its corresponding formula derivation was given. The data processing results for 1 h at six IGS stations in China show that93% of ambiguities can be fixed within 10 min and all ambiguities can be fixed within 15 min. After ambiguity fixing, the positioning accuracy is improved by more than 85% in the E and N directions, with absolute positioning accuracy reaching millimeter level, and it was improved by 70% in the U direction,reaching centimeter level; the proposed zero-differenced ambiguity fixing model can effectively improve the convergence rate and positioning accuracy in PPP. Data monitoring continuously conducted for half a year at four CORS stations of Shanxi China Coal Pingshuo Group validated the feasibility of using PPP in mining area deformation monitoring.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号