首页> 外文期刊>矿业科学技术学报:英文版 >Interlayer interference mechanism of multi-seam drainage in a CBM well: An example from Zhucang syncline
【24h】

Interlayer interference mechanism of multi-seam drainage in a CBM well: An example from Zhucang syncline

机译:煤层气井多煤层排水的层间干扰机理-以株仓向斜为例

获取原文
获取原文并翻译 | 示例
           

摘要

Based on the characteristics of the strong volatility of physical property in vertical direction, high gas content, high resource abundance and large exploitation potentiality of coal reservoir in Bide-Santang basin of Zhina coal field, we study the generation mechanism of interlayer interference, propagation rules of reservoir pressure drop and influencing factors of gas productivity in CBM multi-seam drainage in the paper. On the basis of the actual production data of X-2 well of Zhucang syncline in Bide-Santang basin,by simulating the gas production process of a CBM well under the condition of multiple seam with COMET3 numerical simulation software, we analyze the influencing factors of gas productivity during the process of multi-seam drainage, and illuminate the interlayer interference mechanism of multiseam drainage. The results show that permeability, reservoir pressure gradient, critical desorption pressure and fluid supply capacity of stratum have great influence on gas productivity of multi-seam drainage while coal thickness has little influence on it. Permeability, reservoir pressure gradient and fluid supply capacity of stratum affect the propagation velocity of reservoir pressure drop and thereby affect the final gas productivity. Moreover, the influence of critical desorption pressure on gas productivity of multiseam drainage is reflected in the gas breakthrough time and effective desorption area.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号