首页> 外文期刊>矿业科学技术学报:英文版 >Measurement of shear movements in the overburden strata ahead of longwall mining
【24h】

Measurement of shear movements in the overburden strata ahead of longwall mining

机译:长壁开采前覆盖层地层剪切运动的测量

获取原文
获取原文并翻译 | 示例
           

摘要

An underground coal mine located in New South Wales has a target coal seam located 160–180 m deep directly below a 16–20 m thick conglomerate unit that has been associated with significant periodic weighting events on the longwall face. As part of the investigations to better understand the causes of periodic weighting at the mine,inclinometers capable of measuring horizontal shear movements through the full section of the overburden strata were installed ahead of mining at two locations approximately1 km apart above the centre of two longwall panels. These inclinometers were monitored as the longwall approached each site. This paper presents the details of the installation,the results of the inclinometer monitoring at both sites,and the insights that these measurements provide for overburden behaviour about longwall panels. Horizontal shear movements were observed to develop on shear horizons that correlate closely across the two sites suggesting a mechanism that is consistent across a large area of the mine. Shear movements were observed to develop on a single horizon near the top of the conglomerate strata that was mobilised almost immediately after initial formation of the longwall goaf at a distance of 425 m ahead of the longwall face.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号