Some temperature control techniques adopted in the concrete construction of generator foundation in the No.1 wind power project in Pakistan are introduced.Practice shows that temperature-induced cracks in the concrete are ef-fectively prevented by adopting such techniques and good quality of the concrete construction is ensured.%结合巴基斯坦第1风力发电项目,介绍了在风力发电机基座混凝土施工中,所采取的各项温度控制措施。结果表明,本项目所采取的温控措施,有效地防止了混凝土裂缝的产生,保证了工程质量。
展开▼