The optimization of the design for Yaojiaping Hydropower Project is introduced , including specifically the op-timization of the project layout and the dam construction materials.Comparison shows that the project investment can be saved and greater operation benefit can be obtained after the optimization.%针对姚家坪水电枢纽原设计方案的缺陷,对枢纽原设计方案进行了优化,主要介绍了枢纽布置及大坝用料方案的优化,对方案优化前后的成果进行了对比分析,结果表明,优化方案不仅节约了工程投资,而且实际运行效益显著.