In the construction of the No.1 water conveyance system in Hohhot Pumped Storage Power Station, cavities are found in the backfill concrete above the horizontal segment of the penstock.Possible reasons of these cavities are an-alyzed.Prevention and treatment measures are then proposed, which ensure the safe operation of the water conveyance system.%分析了呼和浩特抽水蓄能电站1号引水系统中平段压力钢管混凝土回填浇筑后产生脱空现象的原因,针对施工中存在的问题,提出了解决措施,总结了压力钢管顶部混凝土脱空浇筑所遵循的基本原则和实施要点,为呼和浩特抽水蓄能电站输水系统的安全运行奠定了基础。
展开▼