P3软件在抽水蓄能电站施工r进度管理中的应用

         

摘要

近年来,一大批大型抽水蓄能电站工程正在选址规划、施工建设、投产运行,基建管理的任务显得尤为艰巨.本文详细论述了P3软件在荒沟抽水蓄能电站土建施工进度管理中的应用过程,包括工程项目划分、项目分解与筛选、工程分解结构(WBS)编码设计、资源、类别、科目定义、P3软件数据录入等流程,并应用P3软件以图文并茂的形式从工程量状态、施工进度、施工强度三个方面对荒沟抽水蓄能电站进度管理进行了分析.结果表明:P软件有助于提高资源利用率、降低管理成本,缩短工期、节约施工成本,提升进度管理科学化水平.%Recently, a large number of Large Pumped Storage Power Station projects are planned, constructed, and putted into operation, the task of construction management is particularly difficult. This paper discussed the application of Primavera Project Planner software in schedule management of Huanggou pumped storage power station, including project division, project selection,WBS design, definition of resources, category, and subjects,and software data entries. This paper also analyzed the schedule management of Huanggou power station from the state, schedule,and strength of schedule according to the application of Primavera Project Planner software. The results showed that Primavera Project Planner software can help to improve resource utilization,reduce management costs, short the construction period, save construction cost, and improve the scientific level of progress management.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号