The paper makes an introduction to the construction optimization scheme for cantilever platform bent frame on the right of powerhouse upstream hoist of the extension project of Bagong hydropower station. The optimization scheme shortens the construction period and saves the project cost through precise calculation and effective measures corresponding to the actual situations and characteristics of the project.%文章阐述了拔贡水电站改扩建工程厂房上游启闭机右侧悬挑平台排架施工优化方案,经过精确验算,并结合工程实际情况及特点,采取相应措施,达到缩短施工工期,节约成本的效果。