根据拔贡水电站工程的特点,重点布置了大坝变形监测、渗流等监测项目,监测布置方案合理,监测方法简单可靠,能够有效地反映枢纽主要建筑物的运行状态。%According to the characteristics of Bagong hydropower station, the emphases of dam safety monitoring are put on dam deformation and seepage etc. The monitoring scheme is reasonable and the monitoring method is simple and reliable, which can effectively reflect the running state of main structures of the hydro-complex.
展开▼