首页> 中文期刊> 《红水河 》 >拔贡水电站改扩建工程同期系统设计相关问题的探讨

拔贡水电站改扩建工程同期系统设计相关问题的探讨

             

摘要

“无人值守,少人值班”是21世纪以来新建电源项目尤其是水电站建设的要求,目的是降低人工成本、提高电站的自动化水平,而同期系统微机精算化是实现这一目标的重要环节。拔贡水电站改扩建工程同期系统按照相关的原则和要求进行了设计和招投标,购置的设备基本上是国内外知名的品牌产品,但在实际应用中,目前的同期系统设计存在一些问题,值得进行探讨。%"Few people attendance and even no people attendance power project" is a new tendency required by power projects, especially hydropower projects, since entering the twenty-first century, so as to reduce labor costs and improve automation level of the power station. While, an important link in achieving this goal is the computer actuarial technology of the synchronous system. The synchronization system of the extension project of Bagong hydropower sta-tion is designed and purchased according to related principles and requirements;however, there are still some prob-lems found in practical applications of the system equipments, although these equipments are basically famous do-mestic and foreign products.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号