An introduction was made on the comparison of type,rated head,quantity and parameters of turbine and the finally determined parameters for Xiangshui Hydropower Station Expansion Project,or 2nd-stage project.%论述了响水水电站扩机工程(二期工程)水轮机型式、额定水头、机组台数、水轮机参数的比选过程和最终确定的各参数。