首页> 中文期刊> 《广东水利水电 》 >宝口站“2013.08”特大洪水流量确定

宝口站“2013.08”特大洪水流量确定

             

摘要

受强台风“尤特”登录影响,白盆珠水库流域发生了超百年一遇特大洪水。该文采用水位~流量关系、 Q~A R关系、比降-面积及瞬时单位线等方法推求白盆珠水库上游宝口站洪峰流量,并对推求的结果进行对比分析,以确定合理的洪峰流量。其分析成果可为今后流域开发治理、工程规划设计、防灾减灾等工作提供参考。%Affected by Typhoon Utor make landfall , a flood of 100 years recurrence encountered in Baipenzhu Reservoir Basin .Peak flow of Baipenzhu reservoir upstream Baokou station has been calculated by the methods of stage -discharge relation , Chezy formu-la, roughness for and instantaneous unit hydrograph .With comparative analysis on the calculation results , the reasonable peak flow has been determined .And the results can be reference for the development and treatment of river basins , engineering program de-sign, disaster prevention and reduction and mitigation work in the future .

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号