首页> 外文期刊>世界地质(英文版) >Drillhole high-pressure packer permeability test for underground powerhouse in Pushihe pumped storage hydro-plant
【24h】

Drillhole high-pressure packer permeability test for underground powerhouse in Pushihe pumped storage hydro-plant

机译:普什河抽水蓄能电站地下厂房钻孔高压封隔器渗透性试验

获取原文
获取原文并翻译 | 示例
       

摘要

Usually the water head of the pumped storage hydro-plant is high, generally up to 400-500 m, therefore the rock mass under the high-pressure bifurcation pipe have to bear as high as millions Pascal water pressure, in according with the requirements of high water head pumped storage hydro-plant should be 1.2 times of the water head special high-pressure packer permeability test compared with normal to test the permeability of rock and rock cleavage pressure value. The test results on the choice of design options often play a decisive role. Based on the engineering practice, the authors studied the drillhole high-pressure packer permeability test in the pumped storage hydro-plant's underground powerhouse, by the analysis of test results, this article offers a demonstration of the deformation of rock fracture witch under building in the condition of high-pressure water head, it provides a more detailed engineering geological background.

著录项

  • 来源
    《世界地质(英文版)》 |2010年第2期|85-89|共5页
  • 作者单位

    Institute of Northeast Hydroelectric Investigation Design, Changchun 130000, China;

    College of Construction Engineering, Jilin University, Changchun 130026, China;

    Institute of Northeast Hydroelectric Investigation Design, Changchun 130000, China;

    Institute of Northeast Hydroelectric Investigation Design, Changchun 130000, China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 chi
  • 中图分类
  • 关键词

  • 入库时间 2022-08-19 04:09:36