首页> 中文期刊> 《全球能源互联网(英文版)》 >Influences of uncertainties to the generation feasible region for medium- and long-term electricity transaction

Influences of uncertainties to the generation feasible region for medium- and long-term electricity transaction

         

著录项

  • 来源
    《全球能源互联网(英文版)》 |2020年第6期|595-604|共10页
  • 作者单位

    Department of Electrical Engineering State Key Lab of Power Systems Tsinghua University Beijing 100084 P.R. China;

    Department of Electrical Engineering State Key Lab of Power Systems Tsinghua University Beijing 100084 P.R. China;

    Department of Electrical Engineering State Key Lab of Power Systems Tsinghua University Beijing 100084 P.R. China;

    State Grid Corporation of China Beijing 100031 P.R. China;

    State Grid Corporation of China Beijing 100031 P.R. China;

    State Grid Corporation of China Beijing 100031 P.R. China;

    State Grid Corporation of China Beijing 100031 P.R. China;

    Brandeis University Boston MA USA 02454;

  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号