首页> 中文期刊> 《全球能源互联网:英文版》 >Research and comprehensive evaluation on delivery schemes of the Grand Inga hydropower station

Research and comprehensive evaluation on delivery schemes of the Grand Inga hydropower station

         

摘要

Congo River has abundant hydropower resources,and large-scale cascade power stations,such as the Grand Inga,can be constructed in downstream locations.However,the fragile economic foundations of the Democratic Republic of the Congo and neighbor!ng Central African countries,and the small-scale regional power consumption market prohibit the implementation of large-scale hydro power projects.As the high-voltage,I on g-dista nee power transmission tech no logy matures,hydropower from the Grand Inga can be delivered to load centers in other regions of Africa.This study establishes a 6 dime nsional comprehe nsive assessment model using the best-worst method to evaluate large-scale,I on g-distance,cross-border power intercon necti on projects.The model is applied to evaluate all the can didate in ter-regional power delivery schemes of the Inga III hydropower station,and the evaluation results can effectively help investment institutions and policy makers in policy making and potential market targeting.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号