首页> 中文期刊> 《全球能源互联网:英文版》 >Generation-expansion planning with linearized primary frequency response constraints

Generation-expansion planning with linearized primary frequency response constraints

         

摘要

As renewable energy resources increasingly penetrate the electric grid,the inertia capability of power systems has become a developmental bottleneck.Nevertheless,the importance of primary frequency response(PFR)when making generation-expansion plans has been largely ignored.In this paper,we propose an optimal generation-expansion planning framework for wind and thermal power plants that takes PFR into account.The model is based on the frequency equivalent model.It includes investment,startup/shutdown,and typical operating costs for both thermal and renewable generators.The linearization constraints of PFR are derived theoretically.Case studies based on the modified IEEE 39-bus system demonstrate the efficiency and effectiveness of the proposed method.Compared with methods that ignore PFR,the method proposed in this paper can effectively reduce the cost of the entire planning and operation cycle,improving the accommodation rate of renewable energy.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号