首页> 外文期刊>全球能源互联网:英文版 >Benefit allocation model of distributed photovoltaic power generation vehicle shed and energy storage charging pile based on integrated weighting-Shapley method
【24h】

Benefit allocation model of distributed photovoltaic power generation vehicle shed and energy storage charging pile based on integrated weighting-Shapley method

机译:基于综合加权-Shapley方法的分布式光伏发电车棚及储能充电桩利益分配模型

获取原文
获取原文并翻译 | 示例
       

摘要

In this study,to develop a benefit-allocation model,in-depth analysis of a distributed photovoltaic-powergeneration carport and energy-storage charging-pile project was performed;the model was developed using Shapley integrated-empowerment benefit-distribution method.First,through literature survey and expert interview to identify the risk factors at various stages of the project,a dynamic risk-factor indicator system is developed.Second,to obtain a more meaningful risk-calculation result,the subjective and objective weights are combined,the weights of the risk factors at each stage are determined by the expert scoring method and entropy weight method,and the interest distribution model based on multi-dimensional risk factors is established.Finally,an example is used to verify the rationality of the method for the benefit distribution of the charging-pile project.The results of the example indicate that the limitations of the Shapley method can be reasonably avoided,and the applicability of the model for the benefit distribution of the charging-pile project is verified.
机译:在本研究中,为了开发益处分配模型,进行了对分布式光伏电力的深度分析,进行了分布式光伏电力支架和储能充电桩项目;该模型采用福利综合赋权益处分布方法开发。首先,通过文学调查和专业面试来确定项目各个阶段的风险因素,开发了一种动态的风险因素指标系统。秒,获得更有意义的风险计算结果,主观和客观重量组合,重量每个阶段的危险因素由专家评分方法和熵权法决定,并且建立了基于多维风险因素的兴趣分布模型。最后,使用示例来验证该益处方法的合理性充电桩项目的分布。该示例的结果表明,可以合理地避免了福利方法的局限性,以及应用程序验证了充电桩项目的益处分布模型的TY。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号