Utilization of cross-regional interconnector and pumped hydro energy storage for further introduction of solar PV in Japan

机译:利用跨区域互连器和抽水蓄能在日本进一步引入太阳能光伏

获取原文
获取原文并翻译 | 示例
       
机译:The amount of solar PV installed capacity has steadily increased to 44.5 GW at the end of FY2017,since the introduction of the Feed in Tariff(FiT)to Japan in 2012.On the other hand,since the first curtailment of solar PV was conducted on October 13th,2018 in the Kyushu area,the curtailment has been frequently executed including wind power after that.In this study,cross-regional interconnector and pumped hydro energy storage(PHES)are focused on mitigating curtailment.In Japan,there are 9 electric power areas which connected each other by cross-regional interconnectors.According to the historical operation,cross-regional interconnectors were secured as emergency flexible measures,but after the implicit auction was started from October 2018,it is used on merit order.Regarding a PHES in Japan,they have been built with nuclear power plants for several decades.Because the output of nuclear power generation is constant,so the PHES is used to absorb the surplus at nighttime when the demand declines.All nuclear power plants in Japan have been shut down after the accident at the Fukushima Daiichi Nuclear Power Plant following the Great East Japan Earthquake that occurred on March 11th,2011.There are several nuclear power plants that have been restarted(9 reactors,as of August 2019).In this study,the amount of curtailment for solar PV in the Kyushu area is sent to the Chugoku area using the cross-regional interconnector(Kanmon line).Then,the PHES in the Chugoku area is pumping with low price.Because the spot price in the market is low when the curtailment is executed.After that,the PHES is generating at night with high price when the solar PV is not generating.It makes a profit by the deference for the cost of pumping and the revenue of generating by the PHES.As a calculation result,for one week from May 2nd to 8th,2019,a profit becomes 152.2 million JPY(about 1.22 million EUR).For this purpose,it is necessary to raise the operation capacity of the cross-regional interconnector up to the rated capacity with the frequency control function of solar PV instead of the capacity to keep frequency in the event of an accident.This will allow the further introduction of solar PV in Japan.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号