对于施工前的准备进行了详细介绍。对变压器的就位、附件的组装、真空注油、热油循环、补充注油等操作分别进行了具体阐述,为相关方面的操作提供了参考。% For pre-construction preparation are described in detail.Transformer in place,the assembly of the attachment,vacuum oiling,hot oil circulation and refueling operations were specifically addressed to provide a reference for the relevant aspects of the operation.
展开▼