Challenges and Thoughts on Risk Management and Control for the Group Construction of a Super-Long Tunnel by TBM

机译:TBM超长隧道群建对风险管理与控制的挑战与思考

获取原文
获取原文并翻译 | 示例
       

摘要

The total length of the second stage of the water supply project in the northern areas of the Xinjiang Uygur Autonomous Region is 540 km,of which the total length of the tunnels is 516 km.The total tunneling mileage is 569 km,which includes 49 slow-inclined shafts and vertical shafts.Among the tunnels constructed in the project,the Ka-Shuang tunnel,which is a single tunnel with a length of 283 km,is currently the longest water-conveyance tunnel in the world.The main tunnel of the Ka-Shuang tunnel is divided into 18 tunnel-boring machine (TBM) sections,and 34drilling-and-blasting sections,with 91 tunnel faces.The construction of the Ka-Shuang tunnel has been regarded as an unprecedented challenge for project construction management,risk control,and safe and efficient construction;it has also presented higher requirements for the design,manufacture,operation,and maintenance of the TBMs and their supporting equipment.Based on the engineering characteristics and adverse geological conditions,it is necessary to analyze the major problems confronted by the construction and systematically locate disaster sources.In addition,the risk level should be reasonably ranked,responsibility should be clearly identified,and a hierarchical-control mechanism should be established.Several techniques are put for ward in this paper to achieve the objectives mentioned above;these include advanced geological prospecting techniques,intelligent tunneling techniques combined with the sensing and fusion of information about rock parameters and mechanical parameters,monitoring and early-warning techniques,and modern information technologies.The application of these techniques offers scientific guidance for risk control and puts forward technical ideas about improving the efficiency of safe tunneling.These techniques and ideas have great significance for the development of modern tunneling technologies and research into major construction equipment.
机译:新疆维吾尔自治区北部地区二期供水工程总长度为540 km,其中隧道总长度为516 km。隧道总里程为569 km,其中慢速隧道49条。斜井和竖井。在该工程建设的隧道中,加双隧道是一条单隧道,全长283 km,是目前世界上最长的输水隧道。嘉双隧道分为18个隧道掘进机(TBM)段和34个钻爆段,共有91个巷道面。嘉双隧道的建设一直是项目建设管理中前所未有的挑战,风险控制和安全有效的施工;对TBM及其支撑设备的设计,制造,操作和维护也提出了更高的要求。 ns,有必要分析施工过程中遇到的主要问题并系统地确定灾害源。此外,应合理地确定风险等级,明确责任,建立分级控制机制。本文旨在实现上述目标,包括先进的地质勘探技术,智能隧道技术以及与岩石参数和力学参数有关的信息的感知和融合,监测和预警技术以及现代信息技术。这些技术的应用为风险控制提供了科学指导,并提出了提高安全隧道效率的技术思路。这些技术思想对现代隧道技术的发展和重大施工设备的研究具有重要意义。

著录项

  • 来源
    《工程(英文)》 |2018年第001期|112-122|共11页
  • 作者

    Mingjiang Deng;

  • 作者单位

    Xinjiang Association for Science and Technology, Urumqi 830011, China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-19 04:11:09