首页> 中文期刊> 《能源工程》 >工业及采暖热负荷同时需求的350 MW超临界供热机组装机方案研究

工业及采暖热负荷同时需求的350 MW超临界供热机组装机方案研究

         

摘要

The condition of heat and industry load of Xingtai thermal power plant was introduced , in order to solve the 4.0MPa pressure level industrial steam as the main line .Four feasibility schemes were proposed and comparativly ana -lyzed,and it was considered that hot reheat steam extraction and outside steam cooler of 350 MW supercritical unit was the best solution.%介绍了邢台热电厂供热机组承担的采暖和工业热负荷情况,以解决4.0 MPa 压力等级工业蒸汽为主线,配置四种装机方案进行对比分析,认为采用350 MW 超临界机组再热热段抽汽+外置式蒸汽冷却器为最佳方案。