110 kV平兴站启动过程要点分析

         

摘要

介绍了扩大内桥式接线的110 kV平兴站启动方案的思路,结合现场启动过程,对命名编号、保护调整、向量试验、电压控制、现场操作等启动过程的要点进行讨论和分析,以此来提高新建输变电工程启动的质量和水平,为优化类似110 kV新建输变电工程启动,保障电网安全运行提供了参考。%Introduction was made to the starting program consideration of 110 kV Pingxing substation of extended inner bridge wiring connection. Combined with the onsite starting process, this paper discussed and analyzed naming number, protection ad-justment, vector test, voltage control and onsite operation etc starting process points, so as to improve the quality and level of new power transmission and transformation engineering starting, which provides references for optimizing similar 110 kV new power transmission and transformation engineering starting and for ensuring power network operating safely.