Since the Third Plenary Session of the 11th Congress of the CPC called in 1979 to redouble the GNP of China from 1980 to the year 2000, the electric power industry developed most rapidly, with installed generating capacity reached 100 GW in 1987, and 200 GW in 1995. The reform and
展开▼