首页> 中文期刊> 《电气:英文版》 >Improve Cost-effectiveness of Power Plant Turbines

Improve Cost-effectiveness of Power Plant Turbines

             

摘要

Shanghai Turbine Works is the firstturbine manufacturer in China, starting fromthe production of first 6 MW mediumpressure steam turbine in 1953. It hasdeveloped 12 MW to 300 MW steam turbinesof various capacities of condensing,intermediate reheat or cogeneration types. Upto 1995, the production of 300 MWsubcritical pressure intermediate reheat steamturbine has been accumulated to 60 sets. The600 MW class steam turbine is currentlyunder manufacture. Shanghai Turbine Worksis the only manufacturer in China to producelarge capacity nuclear turbine. The first set of310 MW nuclear turbine produced inDecember 1991 has been operating stably inQinshan Nuclear Power Plant, China. Overthe past 40 years, Shanghai Turbine Workshas produced 995 sets of power plant turbineswith 45.91 GW total capacity, which occupiesabout 30 percent of total installed fossil unitcapacity in China. Fig. 1 is the unit capacityincrement of Shanghai Turbine Works over the years.China is a huge market for electric powerdevelopment. Up

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号