首页> 中文期刊> 《电气:英文版》 >Earth resistivity measurements for HVDC ground electrodes and line design

Earth resistivity measurements for HVDC ground electrodes and line design

         

摘要

The first ±500 kV project (bipolar),Gezhouba to ShanghaiHVDC project,has been set up and put into operation in1990 in China.The HVDC line is 1000 km long,interconnecting the centraland east electric power networks of China.It is necessary to measure the extensive earth resistivity

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号