首页> 中文期刊> 《电气:英文版》 >Generator operation luci monitor-P.Q.Luci Monitor

Generator operation luci monitor-P.Q.Luci Monitor

         

摘要

As the development of the net-work,the rapidly increasingcharging reactive power caused by the con-struction of EHV long distance transmissionlines,especially the commissioning of 500kV transmission lines in many large powersystems,has been a problem to be solved.At the same time,a number of power ca-pacitors are installed in the distribution

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号