首页> 外文期刊>电气(英文版) >珞璜电厂4×360 MW机组烟气脱硫工程评述
【24h】

珞璜电厂4×360 MW机组烟气脱硫工程评述

机译:珞璜电厂4×360 MW机组烟气脱硫工程评述

获取原文
获取原文并翻译 | 示例
       

摘要

论述了珞璜电厂4×360 MW机组烟脱硫工程所采用的石灰石-石膏湿法工艺技术,二期脱硫工程的实施进程,一、二期脱硫设备的工艺特点及差异,并对此种脱硫工艺提出若干见解.%This paper elaborates the wet limestone gypsum technology adopted in the flue gasdesuifurization projects of 4× 360 MW generating units in Luohuang Power Plant, theimplementation process of Phase Ⅱ desulfurization project, the technical features and differencesof Phase Ⅰ and Ⅱ desulfurization plants, and puts forward some suggestions for FGD projectconstruction.
机译:论述了珞璜电厂4×360 MW机组烟脱硫工程所采用的石灰石-石膏湿法工艺技术,二期脱硫工程的实施进程,一、二期脱硫设备的工艺特点及差异,并对此种脱硫工艺提出若干见解.%This paper elaborates the wet limestone gypsum technology adopted in the flue gasdesuifurization projects of 4× 360 MW generating units in Luohuang Power Plant, theimplementation process of Phase Ⅱ desulfurization project, the technical features and differencesof Phase Ⅰ and Ⅱ desulfurization plants, and puts forward some suggestions for FGD projectconstruction.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号